Skip to content

Design System Updates: Search/Filter Modal #1600

@annaseulgi

Description

@annaseulgi

Dependency

Un-Blocks

Overview

The design team needs to update the calendar picker to address the following issues identified by the research and product teams:

  • No confirmation after users select a date range
  • Layout of the calendar is not intuitive
  • Data is limited to the past 30 days (NEW issue as of 2/21/24)

Action Items

  • brainstorm w/ design team to identify which features to improve on the calendar picker
  • create wireframes and get feedback from design team
  • revise wireframes based on feedback and create interactive prototype
  • usability test interactive prototype with design team
  • run through interactive prototype with developers to identify potential constraints
  • add popover message to show users that data is limited to the past 30 days
  • add double chevron to date picker/calendar to indicate earliest date of data collection
  • Remove "Last 3 Months" from the date range dropdown and replace with "Custom Date Range"
  • handoff to developers

Hand Off Materials

Figma Section Name: Search/Filter Modal #1600 - Final

Before Screenshot

Screenshot 2024-10-02 at 6 20 28 PM Screenshot 2024-10-02 at 6 20 47 PM Screenshot 2024-10-02 at 6 21 04 PM

After Screenshot (Finalized)

Screenshot 2024-10-02 at 6 22 15 PM Screenshot 2024-10-02 at 6 22 26 PM Screenshot 2024-10-02 at 6 22 39 PM

Resources/Instructions

  • Interactive Prototype Figma file
    • please refer to the 'Allison J' page and the wireframes under 'INTERACTIVE PROTOTYPE - 2.27.24'
  • Popover Message Figma file
    • refer to the 'Anna K' page and the 'Popover' section

Metadata

Metadata

Assignees

No one assigned

    Labels

    Complexity: MissingThis ticket needs a complexity (good first issue, small, medium, or large)Pre-LaunchDescribes an issue that must be completed in order to launchp-feature: Mapassociated with the MAP page for public viewing/interactionrole: UI/UX Designticket for the UI/UX Design team to work on; type, font, placement aesthetics of the sitesize: 2ptCan be done in 7-12 hours

    Type

    No type

    Projects

    Status

    Done (without merge)

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions