Skip to content

Allow relative dates in shift configuration #209

@jeriox

Description

@jeriox

I expect dates used in the shift configuration for the signup methods to be used as relative dates (e.g. 10 days before the event). This is especially handy for copying an event while preserving the correct relative signup date.

Metadata

Metadata

Assignees

No one assigned

    Labels

    [C] enhancementChanges to an existing feature making it better[P] minorfeatures or bugs that can wait for some more time

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions